Bunn AutoPOD Manuel de réparation Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 27
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
Page 12
FIG.12-3INLETVALVE-AutoPod
FIG.12-4INLETVALVE-MyCaféAP
Location:
The inlet valve is located inside the back cover.
Test Procedures:
1. Refer to the Programing Section for Service Tools/
Test Outputs/Inlet Valve.
2. Be sure container is placed on drip tray before
activating valve.
3. Check the valve for coil action. Turn on the valve
with the test mode. Listen carefully in the vicinity of
the brew valve for a click as the coil pulls the plunger
in.
If no sound is heard as described, proceed to #4.
If the sound is heard as described, there may be
a blockage in the valve , hose, tank, or sprayhead.
Disconnect the brewer from the power source.
Remove the valve and inspect for blockage, and
de-lime all related areas.
4. Connect the voltmeter leads to the coil terminals.
Turn on the valve with the test mode.
Set the meter to AC volts. The indication should be
line voltage when activated.
If voltage is present as described, but no coil action
is observed, valve is defective. Disconnect leads and
check coil for continuity.
Replace valve and test again to verify repair.
If voltage is not present as described, refer to Wiring
Diagrams and check the brewer wiring harness. Also
check the control board for proper operation.
RemovalandReplacement:
1. Disconnect the brewer from the power source.
2. Disconnect wires from the valve.
4. Pinch and Remove hose(s) from the valve.
5. Remove the two screws securing the valve.
6. Install new valve using the two screws.
7. Reconnect wires and hoses to the valve and secure
in place with clamps.
FIG.12-1INLETVALVE-AutoPod
INLET VALVE
FIG.12-2INLETVALVE-MyCaféAP
41169 120711
CHECKVALVE
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 26 27

Commentaires sur ces manuels

Pas de commentaire