Bunn AutoPOD Manuel de réparation Page 16

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 27
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 15
Page 16
Location:
The air pumps are located inside the back access
panel.
Function:
A: Blows moisture out of pod after brewing, before
being ejected.
B: Pressurizes tank during hot water dispense in
conjunction with air vent valve.
Test Procedures:
1. Disconnect the brewer from the power source.
2. With a DC voltmeter, check voltage across the
two wires at motor (Black probe to brown wire,
red probe to orange wire. Connect the brewer to
the power source. Activate motor(s) in the "TEST
OUTPUTS" program mode. The indication must
be 12 vdc.
3. Disconnect the brewer from the power source.
If voltage is present as described, circuit is working
correctly,
If voltage is not present as described, proceed to #4.
4. Disconnect two pin connector from motor. Check
the resistance across the two terminals of the
motor. The indication should be approximately
21.6 - 26.4
.
If resistance is to specification, replace the control
board.
If resistance is not to specification, replace the motor.
RemovalandReplacement:
1. Disconnect the brewer from the power source.
2. Disconnect the two pin connector for motor.
3. Remove screw securing motor clamp.
4. Disconnect hose from motor.
5. Install in reverse order.
AIR PUMPS
FIG.16-1AIRPUMPS-MyCaféAP
FIG.16-2AIRPUMPS-AutoPod
A
B
A
B
41169 120711
Vue de la page 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 26 27

Commentaires sur ces manuels

Pas de commentaire